Skip to content

Installed byDezire Metal Roofing

A long run of new corrugated sheeting on a low outbuilding roof, looking down over a fenced grassed yard

Shed and Outbuilding Roof Replacement in Sydney

Shed roof replacement in Sydney is usually a one or two day job for a roof plumber, covering sheds, workshops and outbuildings.

  • Our roof plumber holds a Certificate III in Roof Plumbing.
  • Up to 15 years on our workmanship, in writing.
  • We cover all of Sydney and get to the west first.

Get a measure and quote

Get your roof quoted

Provide your details and we will call you back to book a time to measure it.

Your enquiry goes to Sydney Metal Roof Replacements and Dezire Metal Roofing, who does the work and will contact you about your roof. See our privacy policy.

What the job includes

Full sheet replacement

Old sheets off, the beams the sheets are fixed to (purlins) checked, new steel on.

The frame gets looked at

Shed frames are usually light steel or timber and they are where the real problem tends to be.

Guttering while we are there

Replacing a rusted shed gutter takes minutes while we are there. Left until later, it needs a second visit.

Repair where it is enough

If two sheets have gone and the rest is sound, it is quoted as a two sheet job.

Any size of job

There is no lower cut-off, and the crew scales up to roofs of around a thousand square metres.

A few of our roofs

A finished hip roof in grey steel, photographed from the ridge with the street behind
A hip roof part way through replacement, seen from the ridge out over a suburban street
A finished ridge running the length of a house, capping fixed down and the neighbouring tiled roofs behind it

From the first phone call to the clean up

(02) 9072 1993
  1. 1. Look at it

    Most shed roofs fail in a pattern: the low end, the fixings, and wherever a tree overhangs.

  2. 2. Frame assessed

    The sheets are cheap. Rotten timber purlins or rusted steel underneath change the job, and that gets said before you commit.

  3. 3. Sheets off

    Old sheeting removed and taken away rather than stacked behind the shed.

  4. 4. New sheet, new fixings

    New sheeting in the profile that suits the pitch, screwed to the correct pattern with new washers.

  5. 5. Edges finished

    The sloping edges, the top and the gutter done properly, because that is where shed roofs leak first.

What you should know before you commit

A shed roof is a small job that people put off for years, usually because it is not the house and it does not feel urgent until something inside gets wet.

It is also quick: the whole roof is replaced in a day or two.

What goes wrong on a shed roof

Shed roofs fail in a small number of predictable ways, and knowing which one you have decides whether it is a repair or a replacement.

A garage or carport joined to the house is a different job, because the junction is the work, and it is covered under garage and carport roofs.

The low end goes first

Water sits longest at the bottom of the sheet, so that is where the coating gives up. A roof that looks fine from the yard is often gone along the last half metre.

Fixings before sheets

The washers under the screws perish long before the steel does. Rust rings around every screw means the fixings have failed, not necessarily the roof.

Whatever is overhanging it

Leaf litter holds moisture against the sheet permanently. A shed under a tree ages at a completely different rate to one in the open.

The frame underneath

Timber purlins rot where the sheet has been leaking, and light steel frames rust from the inside out. This is the part that turns a small job into a bigger one.

Looking up a run of new corrugated sheeting, fixings set in a line along the crest
Our own work, photographed on the job.

Repair or replace

Not every shed roof needs replacing, and the measure tells you which one yours is.

If the sheets are sound and the fixings have failed, re-screwing with new washers is a legitimate fix and it can add years to the roof. If the steel itself has gone at the laps and the low end, re-screwing is putting new fixings into metal that is finished.

The one situation where replacement is nearly always right is when the roof has been leaking long enough to affect the frame, because at that point you are opening it up anyway.

New sheeting run in against an old brick wall, the last course cut to fit
Our own work, photographed on the job.

Workshops, storage sheds and old fibro

A shed used for storage needs a sound sheet and good fixings. If the shed is a workshop you spend time in, sarking and a vent are worth adding while the roof is off.

A lot of older Sydney sheds are roofed in fibro sheeting, which can contain asbestos. A licensed asbestos removalist takes that off first, and the new metal roof goes on after.

Fibro comes off first

If your shed roof is asbestos cement, a licensed asbestos removalist takes it off before the new sheet goes on. Send a photo and we can tell you if it looks like fibro. Only a lab test can confirm asbestos.

Want this priced for your roof rather than in general?

Drips with no rain: condensation

A common call about a shed roof is water dripping inside on a clear morning, which is condensation rather than a leak and it will not be fixed by new sheeting on its own.

A bare metal roof over an unheated space gets colder than the air underneath it overnight. Moisture in that air condenses on the underside of the sheet and, once there is enough of it, runs off and drips.

It is worth knowing this before you pay for a new roof, because a brand new sheet does exactly the same thing.

How to tell them apart

A leak follows rain and appears in the same place. Condensation appears on cold clear mornings, spreads across the whole underside, and stops by mid morning.

Sarking is the fix

An anti-condensation blanket or a sarking layer under the sheet gives the moisture somewhere to go and stops it forming drops on the steel.

Ventilation helps

Air moving through the space carries moisture out. A whirlybird or ridge vent on a closed shed does real work here.

What is stored underneath

Anything damp in a sealed shed, including a concrete slab that has never been sealed, keeps feeding the problem regardless of the roof.

What changes the price

Read the cost guide

The area, and the shape

Two roofs the same size can cost different amounts. Hips (the sloping edges where two roof faces meet), valleys and dormer windows mean more cutting and more flashing, and that is where the hours go.

What is under the sheet

Rotten battens, the timber strips the sheets are screwed to, get replaced, and nobody knows how many until the old roof is off. Our quote says how they are priced.

Getting on and off it

A single storey with a driveway beside it is a different job to a three storey terrace on a shared wall. Access decides scaffold, and scaffold is real money.

The profile and the coating

The shape of the sheet (corrugated, square-ribbed or standing seam) and the grade of coating you pick both change the sheet price. Standing seam is the dearest and is not always the right answer.

Common questions

Shed roofs: common questions

Do you replace shed roofs as well as house roofs?

Yes. Sheds, workshops, outbuildings and similar. They are usually a one or two day job.

Can you just re-screw my shed roof?

If the sheets are sound and only the fixings have failed, yes, and that is often the right answer. If the steel has gone at the laps and the low end, new screws go into metal that is already finished.

My shed roof is old fibro. Can you replace it?

Not the removal. Asbestos cement sheeting has to come off by a licensed asbestos removalist. Once it is gone we can sheet the frame in metal.

Will you replace the shed guttering at the same time?

If it needs it, yes, and doing it during the roof job is far cheaper than bringing someone back for it.

Get your roof measured

On the roof where we can get to it, off satellite imagery where access is awkward. We measure your roof and price that roof.

Call (02) 9072 1993Get a quote