Skip to content

Installed byDezire Metal Roofing

A new dark grey metal roof on a rebuilt house, still scaffolded, the ridge running out towards the water

New Metal Roofs in Sydney

New metal roofs on Sydney extensions, rebuilds and new houses go on from the bare frame, with the same roof plumber finishing every flashing.

  • Our roof plumber holds a Certificate III in Roof Plumbing.
  • Up to 15 years on our workmanship, in writing.
  • We cover all of Sydney and get to the west first.

Get a measure and quote

Get your roof quoted

Provide your details and we will call you back to book a time to measure it.

Your enquiry goes to Sydney Metal Roof Replacements and Dezire Metal Roofing, who does the work and will contact you about your roof. See our privacy policy.

What the job includes

Extensions and additions

A new roof joining an existing one. The join between them is where extensions leak, so that is where we take most care.

New builds and rebuilds

To a build programme, because nothing internal starts until the building is closed in.

Garages, carports, sheds

Smaller jobs, but where they meet the house still has to be sealed properly.

Penetrations planned first

Flues, vents, skylights and solar mounting flashed as part of the roof rather than cut in later.

Any size of job

There is no lower cut-off, and the crew scales up to roofs of around a thousand square metres.

A few of our roofs

A finished hip roof in grey steel, photographed from the ridge with the street behind
A hip roof part way through replacement, seen from the ridge out over a suburban street
A finished ridge running the length of a house, capping fixed down and the neighbouring tiled roofs behind it

From the first phone call to the clean up

(02) 9072 1993
  1. 1. We look at the drawings

    Pitch, profile, penetrations and where the water is going to end up.

  2. 2. You get a written quote

    What is being laid, how it joins anything existing, and which gutters and downpipes go on.

  3. 3. We turn up when the frame is ready

    Starting before the frame is finished causes problems for everyone.

  4. 4. Sheet, flashings, penetrations

    Metal flashings at every join. Sealant alone does not keep water out for long.

  5. 5. Gutters connected to stormwater

    Not discharging at ground level against your footings.

What you should know before you commit

Not every metal roof is a replacement. A new roof goes onto a frame that has never carried one, which happens on extensions, on rebuilds, and on new houses.

There is nothing to strip, and instead the roof has to be right first time against a set of drawings and a build programme.

Where new roofs come from

We work for builders, owner builders and homeowners.

Extensions and additions

A new section of roof that has to tie into an existing one. The join between the two roofs is where the water will try to get in, so that is where we take most care.

Rebuilds

The frame is new but the site is not, so levels and boundaries are already fixed. There is less room to work than on an empty block.

New builds

Roof goes on to a programme, usually with other trades waiting on it, because nothing internal starts until the building is closed in.

Garages, carports and outbuildings

Smaller jobs, but where they meet the house still has to be sealed properly.

New sheeting run in against an old brick wall, the last course cut to fit
Our own work, photographed on the job.

Tying new roof into old

On an extension, the new roof almost always has to meet an existing one, and that junction is where extensions leak.

The two roofs are rarely at the same pitch, the existing sheet is a different age and often a different profile, and the flashing has to accommodate both while still shedding water in the direction the weather comes from.

It is worth deciding early whether the existing roof is being replaced at the same time. Matching a new sheet to a twenty year old faded one is a compromise, and doing both together is often cheaper than doing them five years apart.

Where the existing roof is near its end as well, a full metal roof replacement at the same time removes the join altogether.

A new hip and ridge junction in pale steel, flashing folded and fixed
Our own work, photographed on the job.

What a good finish looks like

On a new roof there is no old roof to compare against, so you judge the work by the finish.

The things to look at are the same on every job: the ridge line straight, the sheet ends cut cleanly and turned where they should be, the valleys sitting flat, the flashings formed rather than caulked, and the gutter running to its outlets.

It is also worth asking for the roof to be left clean. The steel filings left from cutting, called swarf, rust wherever they land, including on a brand new sheet, and it is far easier to sweep off on the day than to explain later.

Translucent sheeting set into a run of steel over a brick wall, letting light into the space below
Our own work, photographed on the job.

Want this priced for your roof rather than in general?

Everything that comes through the roof, and how it gets flashed

Each penetration is a hole in a waterproof surface, and each needs a method suited to the profile and the pitch.

It is far better to know what is coming before the sheet is laid than to cut into a finished roof for it later.

Solar panels are the largest of these, and the order for solar panels and a roof is worth reading before the roof is booked.

PenetrationApproachWhat goes wrong when it is rushed
Flue or vent pipeA purpose-made rubber flashing shaped to fit the sheetSealant used instead of a boot. It lasts a few years and then leaks.
SkylightManufacturer flashing kit matched to the profileA kit for a different profile, packed out with sealant to fit.
Whirlybird or roof ventFormed base flashing over the ribFixed through the pan, putting a hole where the water runs.
Air conditioning penetrationFlashed and sealed at the sheet, supported clear of the roofPipework laid on the sheet, wearing through the coating over time.
Solar mountingFixed to the rib with compatible fastenersMounted through the pan, or with fasteners that corrode against the sheet.
Wall abutmentA metal flashing turned into the wall, with a second one over itSealant beaded along the wall line. It is the most common leak on an extension.
Common penetrations and the approach.

Box gutters and internal drainage

Contemporary designs frequently use a box gutter, set into the roof rather than hung from its edge, often between roof planes or behind a parapet.

They look clean and they are unforgiving. An eaves gutter that overflows makes a mess outside the house. A box gutter that overflows discharges inside the building line, which is water in the ceiling.

If a design has one, three things need checking: enough slope to drain, a large enough drain point at the low end (the sump), and an overflow that spills somewhere you can see it. Access for cleaning is the fourth, and it is the one most often forgotten.

Box gutters are sized under AS/NZS 3500.3, the stormwater drainage standard, and the eaves guttering and downpipes go on in the same job.

Ask where the overflow goes

A box gutter overflow that discharges where nobody can see it is a leak you find out about through the ceiling. It should discharge somewhere obvious, so you notice a blockage before it damages the ceiling.

Working alongside the other trades

On a new build the roof sits between the frame and everything internal, so other trades are waiting on it.

StageWhat we needWhat waits on us
Before we startFrame complete, square and signed off. Penetration positions known.Nothing internal proceeds until the building is closed in.
DuringClear access for material and a place for the truck.Plumbing and electrical roof penetrations coordinate with the sheet.
At completionGutters and downpipes connected to stormwater.Internal linings, insulation and fitout.
What has to happen around the roof.

Low pitch roofs and what they rule out

Contemporary designs frequently run a low pitch, and pitch is the constraint that decides which profiles are possible on any roof.

Every metal profile has a minimum pitch published by the manufacturer, below which it will not shed water reliably and the warranty does not apply. Corrugated needs the most, trapezoidal ribbed profiles handle less, and concealed fix goes lowest of the common options.

This is a check made before quoting, not after. On a low pitch design it can mean the profile you wanted is not available to you, and that is far better learned at the drawing stage than on the day the sheet arrives.

Lysaght rates Klip-Lok down to 1 degree but its Custom Orb corrugated only to 5. Flat and low pitch roofs covers the profiles and the end laps in detail.

What changes the price

Read the cost guide

The area, and the shape

Two roofs the same size can cost different amounts. Hips (the sloping edges where two roof faces meet), valleys and dormer windows mean more cutting and more flashing, and that is where the hours go.

What is under the sheet

Rotten battens, the timber strips the sheets are screwed to, get replaced, and nobody knows how many until the old roof is off. Our quote says how they are priced.

Getting on and off it

A single storey with a driveway beside it is a different job to a three storey terrace on a shared wall. Access decides scaffold, and scaffold is real money.

The profile and the coating

The shape of the sheet (corrugated, square-ribbed or standing seam) and the grade of coating you pick both change the sheet price. Standing seam is the dearest and is not always the right answer.

Common questions

New roofs: common questions

Do you work for builders?

Yes. New roofs on extensions, rebuilds and new builds are a normal part of the work, and crew can be scaled up for larger jobs.

Can you match my existing roof on an extension?

Sometimes. Profiles are usually still available, but an existing roof that has weathered for twenty years will not match a new sheet exactly, so it is worth deciding whether both are being done together.

Do you install skylights and roof vents?

We flash penetrations as part of the roof. It is much better to plan them before the sheet goes down than to cut into a completed roof later.

What size jobs are worth quoting?

Anything up to around a thousand square metres, and there is no lower cut-off. Smaller jobs are worth asking about, and the crew scales for the larger end.

Do you work directly for homeowners on an extension?

Yes. Extensions come to us both ways, through a builder and directly from the owner, and the roof work is the same either way.

How much notice do you need?

It depends on what is already booked. The more useful thing on a new build is being told when the frame will be ready, because a roof booked against an optimistic date helps nobody.

Can you roof a shed, garage or carport?

Yes, and it is normal work. Where the structure meets the house needs the same care as a house roof.

What if my extension roof has to be a lower pitch than the house?

Common, and it is a profile question. Metal profiles have different minimum pitches, so a low pitch section usually just means selecting a profile rated for it.

Who is responsible if the new roof leaks where it meets the old one?

Whoever did the flashing. That is a good reason to have one roof plumber do both roofs where they meet.

Do you roof sheds and farm buildings?

Yes. On an open block the wind matters more, so the screw spacing has to be right, and the flashing where the structure meets anything else is the part to get right.

Get your roof measured

On the roof where we can get to it, off satellite imagery where access is awkward. We measure your roof and price that roof.

Call (02) 9072 1993Get a quote